Step 01
Lighting Assessment
We visit your facility, review your existing lights, and identify which fixtures are eligible for replacement.

Our Process
Thank you for considering us for your energy-efficiency upgrades. Our goal is to make every project as seamless, transparent, and efficient as possible while maximizing the utility incentives available to you. Below is how our programs typically work, what to expect, and how the process differs by project type. For quick answers, see our FAQ — or schedule a free assessment to walk through your facility with us.
Every lighting project follows a detailed utility-required process, from the initial application and site audit through approval, installation, and final inspection.
Each site visit requires detailed documentation and verification to meet utility requirements. Full access to all areas included in the project is required so we can complete the process and keep the project moving toward approval.
Without full site access at each required visit, the utility process cannot move forward and the project cannot proceed.

Lighting Upgrade Process
Step 01
We visit your facility, review your existing lights, and identify which fixtures are eligible for replacement.
Step 02
We submit your utility bill to start the application. The project is then assigned to one of three program tiers. Once the tier is assigned, the appropriate project workbook becomes available.
Step 03
We complete an exact count and map of all existing lights, documenting fixture type, number of fixtures, bulb type, number of bulbs, and the correct LED replacements. This information is required for the utility pre-inspection.
Step 04
We fill out the required workbook with all customer and project information, including exactly which existing lights will be replaced and the new LED fixtures that will be installed.
Step 05
We submit the project information, lighting quantities, proposed LED fixtures, and required documentation for program review.
Customer Must Sign Required Rebate Documents.
Step 06
The program inspects the existing lighting before any work begins.
We wait for the project to be approved before replacing the lights.
CUSTOMER MUST GIVE FULL ACCESS TO EVERY ROOM THAT WE FILED IN THE WORKBOOK.
Step 07
Once approved, we coordinate an installation date that works for you.
Step 08
Our installation team removes the qualifying existing fixtures and installs the approved energy-efficient LED lighting and controls.
Step 09
Customer Must Sign Required Rebate Documents.
JCP&L / Willdan performs a post-installation inspection to confirm that the approved equipment was installed correctly.
This is a MUST.
CUSTOMER MUST GIVE FULL ACCESS TO EVERY ROOM THAT WE FILED IN THE WORKBOOK.
Site Visits
To complete your lighting project through the utility program, up to five separate site visits are required. Each visit serves a different purpose and requires appropriate access to the facility. Customer cooperation is essential to keeping the project accurate, compliant, and moving forward without delays.
| Site visit | Purpose | Customer involvement | Access needed |
|---|---|---|---|
| #1 Lighting Assessment | Review existing lighting and identify fixtures that may qualify for replacement. | High | Access to all areas where lighting may be included. |
| #2 Detailed Lighting Audit | Count, identify, and map every fixture and bulb and determine the correct LED replacements. | High | Full access is required. Counts must be exact to meet utility requirements. |
| #3 Utility Pre-Inspection | Utility inspector verifies the existing fixtures before approving the project. | Critical | Every project area must be accessible. If any required fixture cannot be verified, the entire project may be withheld from approval. |
| #4 Installation | Remove approved existing fixtures and install the new LED lighting and controls. | High | Installation areas must be accessible so the approved work can be completed efficiently. |
| #5 Prompt Signatures | Keep the project moving without delays. | Critical | All signatures must be signed and returned promptly. |
Prescriptive warehouse and industrial projects are typically faster: installation is completed first and post-inspection is filed afterward.
HVAC Upgrade Process
Energy incentives
Major HVAC and energy rebates follow a structured process built around documentation, coordination, utility approval, and facility detail verification.
Our team guides you from the initial audit through final incentive payment. A smooth approval also depends on on-site access, facility details and documentation, and timely responses when requested.

Step 01
We Confirm You Qualify
Not every building qualifies. We first confirm eligibility before investing time into the project.
Step 02
On-Site Equipment Audit
This stage is detailed and requires full access to mechanical areas. Accuracy here determines rebate approval.
Step 03
Utility Rebate Engineering
The rebate amount is not guessed — it is engineered and calculated according to utility guidelines.
Step 04
Project Approval
Once approved, we prepare everything for official utility submission.
Step 05
Utility Pre-Inspection & Authorization
This stage can take time. The utility controls approvals — not us. Your patience and cooperation are critical.
Step 06
Execution & Final Verification
After final inspection, incentives are released and the project is officially closed.
Energy-saving water measure
High-efficiency sink aerators are a small upgrade with a major impact. They reduce hot water demand and lower the building’s overall energy consumption.
By identifying the right quantities and installing energy-efficient aerators, we can generate additional savings and often increase the total incentive amount — helping minimize out-of-pocket costs.

All work is performed in compliance with utility and program requirements.
We prioritize clarity, proper approvals, and clean execution.
Our focus is on long-term efficiency, reliability, and value.

Certain projects require significant upfront audits, documentation, and coordination. By proceeding, the customer agrees to work with us through the process, or acknowledges that a reasonable fee may apply if the project is discontinued after substantial work has been completed.

If these standards, processes, and terms align with your expectations, we would be glad to move forward. Reach out to schedule your site visit, where we can review your facility in detail and begin planning your upgrades.
Free Site Assessment
Rebate Estimate
0% Financing Options
The fastest way to get started is a quick call or email. Tell us about your facility and we’ll handle the rest — utility program, rebate estimate, and financing options.